WPC Composite Pool
WPC Composite Pool
WPC Composite Pool
WPC Composite Pool

WPC Composite Pool

Greenzone decking features high-performance shell technology and nature-inspired colors, the complementary white railing is a simple solution for a clean finish. Now more than ever, you can complete your high-caliber outdoor living system without compromise.

  • Product Name3rd Generation Luxury Super Anti-slip Decking (co-extrusion)
  • Model NumberDEL14521
  • Size (W*T*L)145 x 21 x 3000 mm, length can be customized (2.2-5.8 meters)
  • Surface TreatmentEmbossing, 3D wood grain/embossing
  • Color6 Colors. Including Teak, Rose wood, Vera wood, Magic grey, Oak, Dark grey, etc.
  • Service Life15-30 Years
  • AdvantageSuper skid resistance, soft touch and barefoot friendly surface, sound absorption
  • ApplicationSwimming pool, garden, balcony, backyard and the other outdoor spaces.

PRODUCT FEATURES

  • Deep wood-grain pattern and luxury colors create a premium, ageless look that leave other composites in the dust.
  • No sanding. No staining. No painting. No kidding. (Not to mention simple soap-and-water cleanup.
  • Capped with 4 sides protective shield, offering protections on the surface and core materials, enhanced mold and mildew resistance, ultra low maintenance.

COLOR SWATCH

Rosewood

Rosewood

Teak

Teak

Verawood

Verawood

FINISHING OPTIONS

1st Generation 3D Ultra-natural Embossing

1st Generation 3D Ultra-natural Embossing

1st Generation Normal Embossing

1st Generation Normal Embossing

1st generation Sanding

1st Generation Sanding

2nd generation Co-extrusion

2nd Generation Co-extrusion

2nd generation Innovative Sandblasted Technology

2nd Generation Innovative Sandblasted Technology

3rd gerneration Super Anti-slip Elastic Technology

3rd Gerneration Super Anti-slip Elastic Technology

ACCESSORIES

Aluminium Joist

Aluminium Joist

Plastic Clip For 5mm Decking Gap

Plastic Clip For 5mm Decking Gap

SS Clip For 1~3mm Decking Gap

Galvanized Steel Pipe

Start Clip

Start Clip

QUALITY CONTROL

Color stability control:

In order to reduce the color deviation in bulk productions, we control it from the raw material, mix the raw material and colorant with formulated percent, make sure the color sample match the color standard, and then the bulk will follow this color sample strictly to control the color.

Bulk production control:

Raw material purchased & bulk production controlled strictly to ensure our products’ competition in products’ surface grain, durability and color control. Some tests will be taken in our laboratory before the delivery, includes the boiling test, flexural test, UV aging test, ensure the good quality for the bulk.

img_Everlasting Series_qc_1 img_Everlasting Series_qc_2 img_Everlasting Series_qc_3 img_Everlasting Series_qc_4

GREENZONE

quality control

CERTIFICATION

CLICK HERE

GREENZONE

Installation

INSTALLATION

CLICK HERE

PACKING & DELIVERY

Standard Package:

Indoor product (indoor wall panel, ceiling and timber tube)–carton package, outdoor product (outdoor decking, cladding and timber tube)–woven bag package. Customized package such as packed with pallet can be provided.

GREENZONE FREQUENTLY ASKED QUESTIONS

down up

Can I use rock salt to melt ice on my decking?

Calcium chloride or rock salt can be used to melt ice and snow on decking. Care should be taken to rinse off when the weather makes this practical. Use plastic shovels (never metal) to remove snow and ice. A metal shovel can possibly chip the decking surface and void the warranty.

down up

How do varying weather conditions affect decking during install?

Decking performs well in varying weather conditions. During installation, it will contract only slightly in cold weather. In hot weather it expands. We recommend that the material is on the job site 48 hours prior to installation to acclimate. Follow the installation instructions spacing guidelines to ensure proper room for expansion and contraction.

down up

How do I fix the balustrade properly?

To ensure that the balustrade is secure you must fix the system to the subframe. You can either do this by drilling holes through the boards to secure into the subframe or you can cut the boards around the post mount to create a space for it to fit.  However you decide to secure the balustrade, please ensure you leave expansion gaps to allow the deck boards freedom to expand and contract.

Send Us a Message Or Request a Free Sample

Fill out the form below and we will be in touch within 24 hours.

    Name *

    Email *

    Phone

    Message *

    email
    up

    close